Storage facilities for import MOP and other such bulk cargo at Mumbai Port Authority for a period upto 180 days and upto 240 days for Gypsum
(No. TM/D-3/02 of 2023-24 dated 16.04.2024)
SOP for the Transportation of CR/HR coils in Mumbai Port Authority premises
(No. TM/ID/Dock Safety/71 of 2024-25 dated 15.04.2024)
Tax Deducted at Source (TDS) & Tax Collected at Source (TCS) for FY 2024-25
(No. TM/B/6-1/TDS/01 of 2024-25 dated 02.04.2024)
Storage facilities for import MOP and other such bulk cargo at Mumbai Port Authority for a period upto 180 days and upto 240 days for Gypsum
(No. TM/D-3/28 of 2023-24 dated 21.03.2024)
Change of recess hours during second and night shift in the month of Ramzan
(No. TM/ZE/66-22/2326 of 2023-24 dated 11.03.2024) D
Prohibition of bringing outside fish into Sassoon Dock
(No. TM/BDR/SDK/388 dated 04.03.2024)
Pre-shipment facilities for storage of export cargo at 12 ID Shed
(No. TM/A/15-22/1310 of 2023-24 dated 23.02.2024)
Requirement of Pollution Under Control ( PUC ) Certificate
(No. TM/Z-1/28 dated 20.02.2024)
Rest rooms’ policy- Use of Rest rooms by workers provided at sheds in Docks
(No. : TM/S/1/27 dated 16.02.2024)
STANDARD OPERATING PROCEDURE FOR BERTHING OF VESSELS AT OCT
Request of M/s. JSW Steel for berthing of their non-scheduled vessels at Mumbai Port/OCT berth for shipment of export cargo viz. HR Coils / CR Coils etc. after completion of maximum 03 days of waiting at most.
(No.TM/B-1/26 dated 24.01.2024)
Celebration of Republic Day
(No. DC/C-FLG/119 dated 10.01.2024)
Reporting of Accident / Dangerous Occurrence during working by deployment of private man Power - Standard Operating Procedure for Reporting of Accident / Dangerous Occurrence.
(No. TM/S/1/25 dated 02.01.2024)
Transporters disobeying safety norms
(No. TM/ID/Dock Safety/1219 of 22-23 dated 01.01.2024)