Mumbai Port Website Mumbai Port Trust


Back
 
 
  Berthing
Berths for Ferry Ships at New Ferry Wharf
Berths for Handling POL and Chemicals
Cargo Berths
Passenger cum Cargo Berths
Permissible dimensions of Vessels
   
Home///Berthing /Permissible dimensions of Vessels
Permissible dimensions of Vessels
 

(Draft : in metres | Displacement : in tonnes)

Name of Dock

Dimension

Max. Normal Dimensions
 (in Metres)

Max. Oversize Dimensions
(in Metres)

Remarks

Indira Docks
Basin Berths 

L.O.A.

175.26

190.50

* Vessel at berth nos. 4/9, 5/8 and 6/7

Beam

24.38

25.91 *

Draft (designed)

8.84 to 9.14 @

9.14

Ballard Pier Extension
Passenger Terminal

L.O.A.

221

221

Permissible displacement 50,000 tons

 

Beam

28.56

32

Draft (designed)

9.75 @

9.75

Ballard Pier
Mole Station

L.O.A.

182.88

196.12

Displacement as per permissible L X B X D

  

Beam

25.91

27.43

Draft (designed)

9.1 @

9.1

Harbour Wall

L.O.A.

160.02

186.0 #

# Only at 18, H.W.

Beam

21.34

24.3 #

Draft

7.0 @

7.0 #

Prince’s Dock

Harbour Wall

L.O.A.

76.20

 

 

Draft

4.57

 

 

New Ferry Wharf
Berths

Beam

13.72

 

 

Draft

4.57 @

 

 

Jawahar Dweep
Marine Oil Terminal
(3 berths)

L.O.A.

225.55

237.75

Min. parallel body length 75 mtrs.

Beam

39.62

 

Draft (designed)

11.2 @

 

Max. Disp.

70,000 tons
(Berths 1 & 3)
48,000 tons
(Berth 2)

 

Jawahar Dweep
4th berth

L.O.A.

290.00

 

Suez max tankers with certain conditions  

 

Beam

Draft  (designed)

39.62

12.2 @

 

Max. Disp.

1,25,000 tons

 

Pir Pau Pier (Old)

L.O.A.
(Day light)

170.69

178.30

Permitted subject to certain conditions and with Dy. Conservator’s permission except in monsoon. Draft maintained is 6.40 mtrs.

Beam

25.91

28.96

Draft  

6.40 @

 

Max. disp.

19,000 tons

Pir Pau Pier (New)

L.O.A. (Day Night)

197.0

197.0

Min. LOA 96.0 m

Beam

28.0

28.0

Draft  

12.0

9.5 (Night)

Displacement

47,000 tons

 

JD5

L.O.A. (Day Night)

333

 

 

Beam

N.A.

 

Draft  

15.8

 

Displacement

2,25,000

 

NPP2

L.O.A. (Day Night)

230

 

 

Beam

34

 

Draft  

11

 

Displacement  

72600

 

@ Draft is subject to dredging /sounding/rise of tides.

(Berthing operations in P&V Docks have been discontinued as filling of P&V Docks for upcoming OCT project is under progress)

(Page Updated on 18.01.2023)

Mumbai Port Authority, India
Sitemap   |    Copyright Policy   |    Hyperlinking Policy   |    Terms and Conditions   |    Privacy Statement   |    Web Information Manager